Hilton Pasadena

Terry Ward (Chief Engineer)
150 South Los Robles Ave.
Pasadena, CA 91101
(916) 368-4200

Scope of work: New hotel construction with 80 suites and guestrooms. Project included plumbing, carpentry, tile, carpet, wall covering, paint, FF&E, and interior work.

Project Size: $ 9,500,000.00



Sheraton Gateway SFO (Year 1996)

Colman Conneely (General Manager)
600 South Airport Blvd.
Burlingame, CA 94010
(650) 340-8500

Mr. Conneely may now be reached at the Hilton Charlotte, NC at (704) 377-1500. Scope of work: Complete Guest bathroom remodel from third to fourteenth floor with 363 guestrooms.

Project Size: $250,000.00



Ramada Inn Hotel

John Dawney (General Manager)
345 Taylor St.
San Francisco, CA 94102
(415) 673-2332

Scope of work: Guestroom, guest bathroom and corridor remodel from second to eighth floor with 108 guestrooms, first floor registration lobby, meeting room, restaurant and hotel front.

Project Size: $200,000.00